Back to Projects

Pitchcraft

17 days

Pitchcraft

1. The Founder's Problem

First pitch deck takes 8-15 hours. Founders need structured frameworks fast to accelerate ideation to pitch process.

2. Why Traditional Solutions Failed

  • Blank page syndrome: founders don't know where to start
  • Generic templates don't fit specific industries
  • AI output is inconsistent without proper prompt engineering

3. What We Built

  • Groq Llama 3.3 70B generating 8 structured components in <60s
  • Components: elevator pitch, market analysis, features, monetization, MVP roadmap, deck outline, viability rating (1-5 stars)
  • 24+ industry categories with context injection (SaaS, FinTech, HealthTech, etc.)
  • Google/GitHub OAuth, Stripe subscriptions
  • Markdown export with proper formatting

4. The Process

WEEK 1

Prompt engineering (4 days), Industry context system (2 days), Auth (1 day)

WEEK 2

AI integration (3 days), Response parser (2 days), UI (2 days)

WEEK 3

Stripe setup (2 days), Markdown export (1 day), Deploy (1 day)

5. Results & Metrics

users

37 signups

revenue

$0 (test mode only)

github

8 stars

performance

45-60s generation, 24+ industries, consistent JSON output

code

95.6% TypeScript, 15 commits

6. Tech Stack & Why

Groq Llama 3.3 70B

Best quality/cost ratio, 800 tokens/s, $0.59/1M tokens

Next.js 15

Middleware for route protection, cleaner than HOCs

Supabase Auth

OAuth built in, easier than NextAuth

ShadCN

Copy paste components, no npm bloat

7. What We Cut to Ship Fast

  • Slide design generation (focus on content, not visuals)
  • Collaborative editing (single user first)
  • Version history (would need complex state management)

8. Lessons Learned

  • Prompt engineering took 15+ iterations. Consistency requires explicit format specs.
  • Industry categorization needs balance: too specific = rigid, too broad = generic.
  • Generation speed matters for ideation tools. 60s is acceptable, 3min is not.

Ready to Build Your MVP?

Let's create something similar for your idea. I can build and launch in 2-3 weeks.

Start Your Project